To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variable

Nominal and real values of completed construction works (Nace Rev.2) by types of constructions, by months

Choose variables

Natasa Cenova, natasa.cenova@stat.gov.mk and Dragan Nedelcin, dragan.nedelcin@stat.gov.mk
2/27/2024
values
7/8/2013
State Statistical Office
ES073M16
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.2010M01 , 2010M02 , 2010M03 ,

Selected 1 of total 168

Mandatory

Selected 0 of total 2

Mandatory

Selected 0 of total 2

Mandatory

Selected 0 of total 3

Number of selected data cells are:
(maximum number allowed is 1 000 000)

Presentation on screen is limited to 10 000 rows and 250 columns

Number of selected cells exceeds the maximum allowed 1 000 000

Obs:

Methodological explanations Symbols used Source: StateStatistical Office
In this Table given are the nominal values of the completed construction works from 2010 onwards, and the real values are calculated with the cost indices deflator for new residential buildings.